Factory and Industry

Assela Malt Factory Expansion Phase-2

Project Name: -Assela Malt Factory Expansion Phase-2
Client: – Assela Malt Factory
Consultant: -Construction Design S.Co.
Contractor: -Afro-Tsion Construction Pvt. Ltd. Co.
Project Amount: – 51,515,574.8 Birr with 15% VAT
Project Status: – Completed
Project Features: – The project consists of Germination, Steeping
plant, Store, Residences, Silos, Site work & related work
Project Name: – Production & Supportive Building Blocks.
previous arrow
next arrow
Slider

Gondar Malt Factory

Client: -Gondar Malt Factory
Consultant: -Ultimate Plan plc Consulting Architects & Engineers
Contractor: – Afro-Tsion Construction Pvt. Ltd. Co.
Project Amount: – 96,701,686.29 Birr including 15% VAT
Project Status: – completed
Project Features: – The project consists the civil works of silo, kilning,
germination, steeping, and boiler room, water treatment plant, cooling
plant, administration, residence, store, guard house, site work and road works
Slider

Modjo Dry Port

Project Name: – Stuffing & Stripping ware house –Modjo Dry Port
Client: -Ethiopian Shipping & Logistic Services Enterprise
Consultant: -Construction Design S.Co
Contractor: – Afro-Tsion Construction Pvt. Ltd. Co.
Project Amount: – 67,989,786.18 Birr including 15% VAT
Project Status: – completed
Project Features: – The project consists of design, supply and building
a steel structured ware house with floor area 5,564 m2 and height above
15 m covered by sandwich panels including the associated site works.
previous arrow
next arrow
Slider